Production Problems

Solving Manufacturing Challenges: Fastener Production Support. Diagnose threading, stripping, corrosion issues with SST’s engineers. Get actionable fixes for assembly line efficiency & product integrity.

3 major production line problems | 48 hours of extreme stop loss

🦷 Rotten threads (42%)

💥 Cracking of the head (35%)

🛢️ Electroplating peeling (23%)

🦷 The case of rotten thread

The root cause

  • insufficient ductility of the material (67% 1008 steel)

  • mold r-angle design error (± 0.02 mm over-tolerance)

Procedure of rescue delivery

  • 1. Received faulty component →2. Reverse modeling by 3D scanning (4H)

  • 3. Spectral analysis of materials (2H)→4. Modification of die parameters (6h)

  • 5. Trial production verification →6. Batch rework (total time ≤36h)

Case data

A new energy automobile enterprise M10 screw rotten teeth

  • original defect rate: 11.3% → corrected: 0.7%

  • cost savings: $370,000/month

My factory VS. traditional factory

The solution

The cycle of traditional firms

Our period

Qualified rate of rework

Rotten teeth of screw thread

5-7 days

48 hours

99.2%

Cracking of the head

3-5 days

24 hours

98.8%

Comparaison avec les concurrents

Étape

Fabricants traditionnels

Notre proposition

Méthodes de diagnostic

Jugement d’expérience expert

Couplage des modèles d’ia et de mégadonnées

Analyse des matériaux

Envoi pour analyse externe (2 jours)

Spectromètre autonome (20 minutes)

Transport de retour au travail

Retour effectué par le client

SF Express collect

Let the professional team escort your design

Submission of requirements →10-minute top speed quotes →36 years experience in team escort production